TM 5-4320-300-14
Table 2-2. Operator/Crew Preventive Maintenance Checks and Services - Continued
B -
Before Operation
A -
After Operation
M - Monthly
D -
During Operation
W -
Weekly
INTERVAL
ITEM TO BE INSPECTED
ITEM
IS NOT READY/
NO. B D A W M
PROCEDURE
AVAILABLE IF
13
Control Panel Assembly. Remove engine side panels. Unfasten
hasps and catch assemblies, then pull side panels up and
out to remove.
Inspect gage tube assemblies for leaks, cracks, deteriora-
There is any
tion, looseness at fittings, or other damage. If any
leakage.
fittings are loose, tighten them slightly. Also inspect
tachometer drive cable for cracks, deterioration, other
damage, or looseness at attachment points. Inspect con-
nections to ammeter and switches for looseness, broken
insulation, or frayed conductors. Inspect all gage clamps
for looseness.
Replace engine side panels.
2-23