TM 5-4320-300-14Table 2-2. Operator/Crew Preventive Maintenance Checks and Services (Continued)B -Before OperationA -After OperationM - MonthlyD -During OperationW -WeeklyINTERVALITEM TO BE INSPECTEDITEMIS NOT READY/NO. B D A W MPROCEDUREAVAILABLE IFInspect alternator assembly terminals for corrosion orloose connections. Tighten loose connections.Replace engine side panel.3·Water Pump. Remove engine right side panel. UnfastenWater pumphasps and catch assemblies, then pull side panel up andleaks exces-out to remove.sively ormakes un-usual noise.2-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business