• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Water Tank Removal.
Figure 5. Water Tank Removal.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  1052    1053    1054    1055    1056  1057  1058    1059    1060    1061    1062  
img
.
TM 5-3825-270-23&P
0195
REMOVAL - Continued
1
WOOD
BLOCKS
AIR LIFTING
BAG
WOOD BLOCKS
Figure 3. Water Tank Removal.
4.
Lower flatrack (Figure 3, Item 1) to ground and remove air lifting bag.
5.
Remove four locknuts (Figure 4, Item 9), eight washers (Figure 4, Item 8), and four screws (Figure 4, Item 7)
from mounting plates (Figure 4, Item 6) and flatrack (Figure 4, Item 1). Discard locknuts.
6
7, 8, 9
1
Figure 4. Water Tank Removal.
WARNING
Empty tank weighs 2,425 lbs (1,100 kg). Do not attempt to lift or move tank without the aid
of an assistant and a lifting device. Failure to comply may result in injury or death to personnel.
6.
Position lifting straps (Figure 5, Item 10) around water tank (Figure 5, Item 11).
0195-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.