Home
Download PDF
Order CD-ROM
Order in Print
Figure 3. Work Light Installation.
WORK LIGHT WIRE HARNESS REPLACEMENT
Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor
Page Navigation
623
624
625
626
627
628
629
630
631
632
633
TM
5-3825-270-23&P
0106
INSTALLATION
- Continued
3.
Connect
connector
(Figure
4,
Item
7) to
connector
(Figure
4,
Item
6).
4.
Repeat
Steps
(1)
thru
(3)
for
left
side.
END
OF
TASK
FOLLOW-ON
MAINTENANCE
Connect
batteries.
(WP
0085)
END
OF
TASK
END
OF
WORK
PACKAGE
0106-5/6
blank