• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Left Water Sprinklers Switch - Step 2.
Figure 4. Negative Terminal Strip - Step 3.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  236    237    238    239    240  241  242    243    244    245    246  
img
. .
TM 5-3825-270-23&P
0043
STEP 3
Are less than 200 ohms measured from pin 2 (black wire) on left solenoid harness connector to negative
terminal strip, terminal 9?
1.
Push in EMERGENCY STOP switch to off position. (TM 5-3825-270-10)
2.
Disconnect batteries. (WP 0085)
3.
Remove six control panel faceplate screws.
CONTROL PANEL
FACEPLATE SCREWS
Figure 3. Control Panel Faceplate Screws - Step 3.
4.
Set multimeter to measure continuity.
WARNING
Ensure electrical power is off prior to working on all electrical systems. Failure to comply
may result in injury or death to personnel.
Remove all jewelry, such as rings, ID tags, bracelets, etc., prior to working on or around
equipment. Jewelry and tools can catch on equipment, contact positive electrical circuits,
and cause a direct short, severe burns, or electrical shock. Failure to comply may result
in injury or death to personnel.
5.
Connect red multimeter probe to negative terminal strip, terminal 9.
0043-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.