• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Gauge Harness Connector - Step 2.
Figure 6. Negative Terminal Strip - Step 3.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  184    185    186    187    188  189  190    191    192    193    194  
img
. .
TM 5-3825-270-23&P
0035
Are less than 200 ohms measured on black wire from ENGINE OIL PRESSURE gauge harness connector,
pin 5 to negative terminal strip, terminal 16.
1.
Push in EMERGENCY STOP switch to off position. (TM 5-3825-270-10)
2.
Disconnect batteries. (WP 0085)
3.
Set multimeter to measure continuity.
WARNING
Ensure electrical power is off prior to working on all electrical systems. Failure to comply
may result in injury or death to personnel.
Remove all jewelry, such as rings, ID tags, bracelets, etc., prior to working on or around
equipment. Jewelry and tools can catch on equipment, contact positive electrical circuits,
and cause a direct short, severe burns, or electrical shock. Failure to comply may result
in injury or death to personnel.
4.
Connect red multimeter probe to ENGINE OIL PRESSURE gauge harness connector, pin 5.
GAUGE
HARNESS
CONNECTOR
1
2
3
4
5
6
BACK OF
CONTROL PANEL
Figure 5. Gauge Harness Connector - Step 3.
5.
Connect black multimeter probe to negative terminal strip, terminal 16.
0035-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.