Figure 34. WWSV Left Front Wheel and Tire Installation.
Figure 36. WWSV Front Wheel and Tire Assembly Torque Sequence.

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  565    566    567    568    569  570  571    572    573    574    575  
img
.
TM 5-3820-276-10-2
0206
WWSV FRONT WHEEL AND TIRE ASSEMBLY REPLACEMENT - Continued
NOTE
There are 10 lug nuts. Socket shown on one lug nut.
12.
Install 33-mm socket (Figure 35, Item 1) and extension (Figure 35, Item 3) on lug nut (Figure 35, Item 2).
1
2
3
4
7
6
5
WWDS00898
Figure 35. Torque Multiplier Installation.
13.
Install torque multiplier (Figure 35, Item 6) to extension (Figure 35, Item 3).
14.
Install extension bar (Figure 35, Item 7) to torque multiplier (Figure 35, Item 6).
NOTE
Torque multiplier has 3 to 1 gear ratio. Wheel torque is 480 lb-ft (651 Nm).
15.
Adjust torque wrench (Figure 35, Item 5) to 160 lb-ft (217 Nm).
16.
Install adapter (Figure 35, Item 4) to torque wrench (Figure 35, Item 5).
17.
Install torque wrench (Figure 35, Item 5) to torque multiplier (Figure 35, Item 6).
0206-31