• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Wheel Chocks Removal - WWSV
Figure 6. Wheel Chocks Installation - MCS

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  142    143    144    145    146  147  148    149    150    151    152  
img
.
TM 5-3820-276-10-1
0015
WHEEL CHOCKS INSTALLATION - MUD CLEANING SYSTEM (MCS)
WARNING
During installation/removal of wheel chocks, remain clear of equipment front and rear as
equipment may move unexpectedly. Failure to comply may result in injury or death to
personnel. Seek medical attention in the event of an injury.
NOTE
If MCS is attached to its tow vehicle, Water Well Drilling Rig, then chocking will not
be necessary.
Always chock wheels if MCS is not connected to tow vehicle.
Make sure local policy for chocking vehicle wheels is followed.
Wheels are chocked on both sides of vehicle, only left-side shown.
1.
Remove strap (Figure 5, Item 1) from MCS (Figure 5, Item 2).
3
1
2
3
4
5
WWDS01001
Figure 5.
Wheel Chocks Stowage Removal - MCS.
2.
Remove chain hook (Figure 5, Item 5) from eyebolt (Figure 5, Item 4).
3.
Remove wheel chocks (Figure 5, Item 3) from MCS (Figure 5, Item 2).
0015-5
02/13/2013root(opusualwp)wpno(O00001)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.