WARNING
When lifting drum, always use five personnel to avoid injury.
The empty drum weighs 220 lbs.
10. Using five personnel, place water drum in shipping crate.
11. Place both bagged coupler valves in shipping crate.
12. Check repair kit for missing parts (WP 0014). Replace any missing parts.
13. Place a complete repair kit in shipping crate with drum.
14. Band shipping crate cover onto shipping crate.
INTERMEDIATE AND LONG TERM STORAGE
No special procedures are required. Follow Administrative Storage procedures.
PREPARATION FOR SHIPMENT
When transporting the fabric drum with the yoke and/or tie-down kit, reference TM 10-8110-201-14&P for applicable
procedures.
END OF WORK PACKAGE