TM 10-5430-245-13&P
UNIT MAINTENANCE
DRUM, FABRIC, COLLAPSIBLE, DRINKING WATER,
500 GALLON CAPACITY
SERVICE UPON RECEIPT
INITIAL SETUP:
Tools:
Personnel Required:
Tool Kit, General Mechanics (WP 0028, Item 1)
Five
UNPACKING
The drum is packaged in a container designed for shipment. The base of the container is constructed as a shipping pallet
with provisions for insertion of fingers of a fork on materials handling equipment such as a forklift. After unloading, unpack
as follows:
1.
Remove banding (Figure 1, Item 1) from the crate top and remove crate top (Figure 1, Item 2) from crate
2
3
1
2.
Remove plastic bag (Figure 2, Item 4) containing cloth bags that contain coupler valves from crate (Figure 2, Item 3).
3.
Remove two coupler valves from the two bags (Figure 2, Item 4) and then remove protective material and tape from
coupler valves. Save bags and put back into crate.
4.
Remove repair kit from cloth bag inside plastic bag (Figure 2, Item 4) and save cloth bag.