j .k.l .m.n.o .p.q .TM 10-4320-344-24Tag and disconnect engine lubrication oil pressure gauge hose assembly (34).Loosen screw (35, sheet 2) and remove universal wire stop (36) from fuel rackc a b l e ( 3 7 ).Remove nut (38), screw (39), and cable clamp (40) from fuel rack cable (37).Remove electrical tiedown straps (18) around wiring harness (19) and fuel rackc a b l e ( 3 7 ).Remove electrical tiedown straps (18) securing sheathing (20), wiring harness(19) and engine coolant temperature gauge tube (41).Remove engine temperature gauge tube (41) from engine (42) and wiringharness (19).Remove two nuts (43, sheet 1), lock washers (44), conduit clamps (45), fourflat washers (46), two bolts (47), and wiring harness (19) from control panelassembly frame (48).Discard lock washers (44).Tag and disconnect suction elbow hose assembly (49) from elbow on suctionelbow.Figure 2-54.Control Panel Assembly Removal and Installation, Model 609-A.r. Remove two bolts (Figure 2-54, 1), lock washers (2), and flat washers (3) fromfront supports (4).s. Remove two bolts (5), lock washers (6), and flat washers (7) from rearsupports (8).2-145
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business