TM 10-4320-344-10Table 2-12.Preventive Maintenance Checks and Services for Pumping AssemblyItemNo.222324IntervalBeforeLocationItem toCheck/ServiceCONTROLPANELEnclosureUS636HCCD-1.(Continued)ProcedureCheck control panel box andcover for damage.Check fordamaged hinge or fastener. Ifbox, cover, hinge, or fasteneris damaged, notify unitmaintenance.BeforeBeforeGauges andMetersControlsNot Fully MissionCapable if:Check gauge and meter facesfor cracked or broken glass.If glass is cracked or broken,notify unit maintenance.Check controls for freemovement.If control binds,notify unit maintenance.Glass is crackedor broken.Control binds.2-73Model
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business