TM 10-4320-315-24
2-16. MAINTENANCE OF CONTROL PANEL ASSEMBLY
This task covers:
a.
Remove
b.
Install
INITIAL SETUP :
Tools
Equipment Conditions
General Mechanics Tool Kit
Battery assembly is disconnected (para. 2-16).
(Item 1, Appendix B)
Personnel Required
Materials/Parts
Two
Tags (Item 21, Appendix C)
a.
REMOVE. (Figure 2-4)
(1)
Open engine access door (1).
(2)
Disconnect electrical connectors P1 and P9 from J1 and J9 on mounting bracket behind control panel.
(3)
Open control panel door (2). Tag and disconnect flexible tube assemblies (3) at drain valves (4) and at
pump gage valves (5). Pull tube assemblies (3) through grommet (6) from rear of control panel (7).
(4) Remove nuts (8), lockwashers (9), flat washers (10), and bolts (11) holding control panel (7).
(5)
Remove control panel (7).
b.
INSTALL.
(1)
Clean mounting surfaces.
(2)
Position replacement control panel (2) on mounting holes and secure with bolts (11), flat washers (10),
lockwashers (9), and nuts (8).
(3) Feed flexible tube assemblies (3) through grommet (6) in control panel (2) and connect at drain valves (4)
and pump gage valves (5) as tagged. Remove tags.
(4)
Connect electrical connectors P1 and P9 to J1 and J9 behind control panel.
(5)
Close and lock control panel door (2) and engine access door (1).
2-24
