TM 10-4320-315-243-7. MAINTENANCE OF NOISE ENCLOSURE ROOFThis task covers: a.Removeb.InstallINITIAL SETUP:ToolsEquipmentConditionsGeneral Mechanics Tool KitPumping assembly is shutdown with leveling jacks(Item 1, Appendix B)and tripod jack assembly in the operating position(refer to TM 10-4320-315-10).Materials/PartsPersonnelRequiredLockwashers (TM 10-4320-315-24P)Foura.REMOVE. (Figure 3-2)(1)Loosen hose clamps (1) and disconnect air discharge hose (2) from air baffle (3) and engine.(2)Remove bolts (4), flat washers (5), and roof (6).(3)Remove bolts (7), nuts (8), lockwashers (9), and brackets (10) from roof (6).b.INSTALL.(1)Install brackets (10) to roof (6) with bolts (7), lockwashers (9), and nut (8).(2)Position roof (6) over noise enclosure panels. Secure with flat washers (5) and bolts (4).(3)Connect air discharge hose (2) to air baffle (3) and engine with clamps (1).3-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business