TM 10-4320-307-24
2-23
ENGINE ENCLOSURE REPAIR/REPLACE (CONT).
INSTALLATION:
Death or serious injury could occur if unauthorized or unnecessary personnel are
in the hoisting area. Permit only personnel actually engaged in the hoisting
operation to be near the unit and hoisting equipment. All instructions for the
hoisting operations must come from one authorized person.
Injury to personnel or damage to equipment could occur from improper hoisting.
Hoist the load slowly to avoid tearing out lifting bail assembly, slipping slings, or
load shift. Do not jerk the load or swing it from side-to-side when hoisting. This
places additional stress on hoisting components which can cause failure and loss
of load. Be sure hoisting equipment is on solid footing and is suitable for the size
of the load. Watch boom angle and overhead clearance when hoisting.
1.
Install end panels (1) as follows:
a.
Position end panels (1) on enclosure hinges and close panels.
b.
Secure end panels (1) to enclosure using five clamps (2), washers, and bolts (3).
2.
Install enclosure (4) to skid assembly (5) as follows:
a.
Secure sling to four eyebolts on enclosure (4). Secure hoist to sling above the center of the enclosure.
The enclosure with doors weighs 1258 lbs (570 kg). Use a suitable lifting device to
prevent injury to personnel.
b.
Carefully lift enclosure (4) from blocks and locate on skid (5) being extremely careful not to damage engine or
pump components.
c.
Align mounting holes and insert 12 screws and washers (6) and nuts (7) and fasten enclosure assembly (4) to
skid assembly (5).
2-61