Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
MAINTENANCE ALLOCATION CHART - TM-10-4320-307-24_562
Section III. TOOL AND TEST EQUIPMENT REQUIREMENTS - TM-10-4320-307-24_564
TM-10-4320-307-24 Pump Assembly (Mainline) Diesel Engine Driven 800 GPM NSN 4320-01-193-3430 Manual
Page Navigation
552
553
554
555
556
557
558
559
560
561
562
TM 10-4320-307-24
Section II. MAINTENANCE ALLOCATION CHART
Flywheel and
Inspect
3.0
Flywheel
Align
1.0
Housing
Replace
3.3
Repair
4.3
Oil Pan and Oil
Inspect
0.2
Gauge Bracket
Replace
1.0
Repair
1.3
Gear Cover
Inspect
0.2
Assy
Replace
7.0
Repair
1.0
2.0
W
Camshaft Assy
Inspect
12.0
Replace
12.0
Repair
12.5
Connecting Rod
Inspect
15.0
and Piston Assy
Replace
15.5
Repair
16.5
Crankshaft Assy
Inspect
7.0
Replace
8.0
Repair
10.0
Cylinder Block
Inspect
17.0
Replace
17.0
Repair
20.0
16
Skid Assy
Inspect
0.2
Oil Drain
Replace
0.8
Assy
Repair
0.9
Suction and
Inspect
0.1
Nozzle Adapter
Replace
1.0
Repair
1.2
Skid
Inspect
0.2
0.3
Replace
30.0
Repair
2.0
34.0
A, V
(5)
TOOLS AND
EQUIPMENT
REF CODE
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
CODE
(2)
COMPONENT/
ASSEMBLY
(1)
GROUP
NO.
C
O
F
H
D
(4)
MAINTENANCE CATEGORY
UNIT
DIRECT
SUPPORT
GENERAL
SUPPORT
DEPOT
B-8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business