Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
MAINTENANCE ALLOCATION CHART - TM-10-4320-307-24_559
MAINTENANCE ALLOCATION CHART - TM-10-4320-307-24_561
TM-10-4320-307-24 Pump Assembly (Mainline) Diesel Engine Driven 800 GPM NSN 4320-01-193-3430 Manual
Page Navigation
549
550
551
552
553
554
555
556
557
558
559
TM 10-4320-307-24
Section II. MAINTENANCE ALLOCATION CHART
11
Infield Instrument
Inspect
0.2
Layout
Test
0.6
9, 13, 14
Replace
1.3
P
Repair
0.7
12
Conduit Layout
Inspect
0.2
Replace
0.8
P
Repair
0.5
Junction Box
Inspect
0.2
Replace
0.5
Repair
0.8
Network Cable
Inspect
0.2
Test
0.5
9
Replace
1.0
Repair
0.6
13
Speed Increaser
Inspect
0.1
Service
0.5
Adjust
0.5
Replace
2.9
Repair
0.5
2.0
8.0
15, 16, 17,
Q, R
18, 19, 20,
21, 22, 23
14
Radiator Assy
Inspect
0.2
Service
0.5
Test
0.5
Replace
2.0
Repair
1.0
4.0
S
15
Engine Assy
Inspect
0.3
Service
0.8
Replace
0.5
Overhaul
36.0
Cold Starting
Inspect
0.1
Aid Assy
Replace
0.3
Air Cleaner
Inspect
0.1
Assy
Service
0.3
Replace
0.5
Repair
0.7
Turbocharger
Inspect
0.1
Plumbing
Replace
0.5
Repair
0.5
Turbocharger
Inspect
0.2
Mounting
Adjust
0.8
Replace
0.8
(5)
TOOLS AND
EQUIPMENT
REF CODE
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
CODE
(2)
COMPONENT/
ASSEMBLY
(1)
GROUP
NO.
C
O
F
H
D
(4)
MAINTENANCE CATEGORY
UNIT
DIRECT
SUPPORT
GENERAL
SUPPORT
DEPOT
B-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business