TM 10-4320-307-24
2-27
BATTERIES, BATTERY BOX, AND BATTERY CABLE ASSEMBLY SERVICE/TEST/REPAIR/REPLACE
(CONT).
Connect positive battery cables to battery first to prevent shocks to personnel and
damage to other electrical system components.
c.
Install positive battery cable assembly (37) to appropriate battery terminals (34) and tighten nuts (43).
NOTE
Use battery box wiring diagram to locate proper battery terminals.
d.
Install two jumper cable assemblies (44) to appropriate battery terminals (34) and tighten nuts (43).
e.
Install negative battery cable assembly (38) to appropriate battery terminals (34) and tighten nuts (43).
f.
Rotate all battery terminal covers (45) onto terminals (34).
2-93