TM 10-4320-226-14
SECTION III. OPERATION UNDER USUAL CONDITIONS
2.3 ASSEMBLY AND PREPARATION FOR USE.
Upon reaching the operating area where pumping assembly is to be used, prepare the
equipment for use as follows:
a.
Prepare a level site.
b.
Be sure all sides
accessible.
c.
When connected to
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(10)
Position the
suction lift
of the equipment and all fittings and controls are easily
towing vehicle, perform following:
equipment as close as possible to the water source. Keep
as low as possible.
Remove pins (figure 2-3, 1 and 2) and extend trailer support legs (3) as
far as possible.
Reinstall pins (1 and 2) to secure trailer support
Release pintle (4) and disconnect pumping assembly
legs (3).
from towing
vehicle (5) .
Secure wheels
Refer to data
positioned as
(6).
plate and ensure two fuel selector valves (7) are
follows:
Fuel tank as source to TANK
Auxilary supply as source to
Remove quick release
shaft (10) inward to
Insert quick release
position.
pins (8 and 9)
FUEL AUX
from trailer tongue and slide tongue
non-extended position and align holes.
pins (8 and 9) and secure tongue in non-extended
2-11