TM 10-4320-307-24
2-32
JUNCTION BOX REPAIR/REPLACE.
INSTALLATION:
1.
Position junction box (1) on mounting (2) and secure
using four screws (3), washers (4), wire (5), and nuts
(6).
2.
Position connectors in junction box and secure using
locknuts (7).
3.
Connect wires from connectors X27 (8), X26 (9), X25
(10), X28 (11), and X6 (12). Remove tags.
4.
Position junction box cover (13) on junction box (1) and
secure using four screws (14) and washers (15).
5.
Position junction box JB1 (16) on mounting (17) and
secure using four screws (18), washers (19), and nuts
(20).
6.
Position connector (21) in junction box JB1 (16) and
secure using locknut (22).
7.
Connect wires from X17 (23).
8.
Position junction box JB1 cover (24) on junction box
JB1 (16) and secure using four screws (25) and wire
(26).
9.
Install field instrument layout in accordance with
paragraph 2-30.
2-118