TM5-4930-230-13The four tiedown links are installed on the skids ona. Remove screws, Iockwashers, and retainer, andeach tank. Replace links as follows:remove tiedown links (figure 4-15).b. Inspect for cracks, breaks, rust, corrosion, or other damage.c.Replace damaged or defective tiedown links.d. Install with retainers, screws, and Iockwashers.Each tiedown assembly consists of a tiedown strap, tiedown bracket and turnbuckle. Fourassemblies are used on each tank and two on the pumping assembly. Turnbuckles are not used on thepumping assembly. Inspect and replace tiedown assemblies as follows:a.Inspect for cracks, breaks, abraded or torn webbing, and other deterioration or damage,b. Replace damaged or defective tiedown straps, tiedown brackets or turnbuckles (figure 4-15).NOTENewer model, see figure 4-16. Older model, see figure 4-17.a.Removal.(1) Refer to figure 4-16 and release cam (9), and raise hinge (8).(2) Open cover (20) and loosen the six wingnuts (2) so that hooks (4) will drop free of tank rim.(3) Lift manhole cover (1) and cover gasket (6) from tank.4-34
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business