INTERVALTM 5-4320-302-14Table 2-2. Operator/Crew Preventive Maintenance Checks and Services-ContinuedBBEFORE OPERATIONAAFTER OPERATIONMMONTHLYDDURING OPERATIONWWEEKLYBDAWMRemove nut assembly from threaded rod.Remove and discard primary element.Remove nut assembly from threaded rod.Remove and discard secondary element.Wipe out interior of body assembly with aclean, dry cloth.Installation.Install secondary element into body assembly.Aline hole in element with threaded rod.Hand tighten nut assembly as necessaryto make a tight, vibration-free installa-tion. Overtightening will deform theelement.Install nut assembly and hand tighten.Install primary element over secondary element.Aline hole in element with threaded rod.Hand tighten nut assembly as necessaryto make a tight, vibration-free installa-tion. Overtightening will deform theelement.Install nut assembly and hand tighten.Install baffle assembly.Install cup assembly.NOTEInstall cup assembly with arrowspointing up.Seat cup assembly against body assembly.ITEMNO.ITEM TO BE INSPECTEDPROCEDUREEQUIPMENT IS NOTREADY/AVAILABLE IF:2-26
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business