• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 28. WWSV Left Rear Outer Wheel and Tire Assembly Installation.
Figure 30. WWSV Rear Wheel and Tire Assembly Torque Sequence.

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  559    560    561    562    563  564  565    566    567    568    569  
img
.
TM 5-3820-276-10-2
0206
WWSV REAR WHEEL AND TIRE ASSEMBLY REPLACEMENT - Continued
1
2
3
4
7
6
5
WWDS00895
Figure 29. Torque Multiplier Installation.
17.
Install torque multiplier (Figure 29, Item 5) to extension (Figure 29, Item 7).
18.
Install extension bar (Figure 29, Item 6) to torque multiplier (Figure 29, Item 5).
NOTE
Torque multiplier has 3 to 1 gear ratio. Wheel torque is 480 lb-ft (651 Nm).
19.
Adjust torque wrench (Figure 29, Item 3) to 160 lb-ft (217 Nm).
20.
Install adapter (Figure 29, Item 2) to torque wrench (Figure 29, Item 3).
21.
Install torque wrench (Figure 29, Item 3) to torque multiplier (Figure 29, Item 5).
0206-25
02/13/2013root(maintwp)wpno(M00009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.