TM 5-3820-276-10-2
0198
Table 4.
PMCS - WWDR - Before Drilling Equipment Operation.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
NOTE
1
Before
Fuel Tank Level
The following PMCS tasks are performed
after WWDR setup has been completed.
1. Set up WWDR (Volume 1, WP 0017).
WARNING
Fuel is highly flammable and can be
accidently ignited. Do not allow fuel to come
in contact with hot surfaces, such as
smoke or allow open flame or sparks in the
vicinity while working on any part of fuel
system. Failure to comply may result in
injury or death to personnel. Seek medical
attention in the event of an injury.
2. Check fuel tanks for proper fuel quantity for drilling
Fuel tanks empty.
operation. Fill fuel tanks (Volume 1, WP 0014).
2
Before
Lubricator
1. Check lubricator assembly oil tank (Figure 32, Item
Oil tank leaking. Notify
Assembly
1) for leaks.
maintenance.
1
WWDS00626
3
2
Figure 32. Lubricator Assembly.
2. Check lubricator assembly oil tank sight gauge
(Figure 32, Item 2) for proper oil level.
02/13/2013root(pmcswp)wpno(I10001)