TM 10-4630-207-13&P
0019 00
Install upper air hose (figure 9, item 6) onto isolation valve hose nipple (figure 9, item 7) and
j.
secure with hose clamp (figure 9, item 8).
Secure primary shutoff portal lid (figure 9, item 9) with wing nut assemblies (figure 9, item 10).
k.
Re-connect isolation valve handle linkage (figure 9, item 11).
l.
11
2
10
9
7
1
3
6
5
8
4
Figure 9. Installing Primary Shutoff Mechanism
END OF WORK PACKAGE
0019 00-7/(8 Blank)