Figure 2-2. Pumping Assembly Model 609-A PMCS Routing Diagram (Sheet 4 of 4).
Table 2-1. Preventive Maintenance Checks and Services
for Pumping Assembly Model 609-A.
Location
Item
Item to
Not wily Mission
No.
Interval
Check/Service
Procedure
Capable if:
PUMPING ASSEMBLY
Do not fill battery without rubber gloves and protective clothing. Electrolyte
causes serious burns. Failure to obey this warning may result in personal
injury or death.
1
2
Quarterly
Quarterly
Battery and
Battery Cables
Pump Assembly
Check specific gravity.
Replace or recharge as
required. (Refer to TM 9-
6140-200-14). Clean and
service battery cable
assemblies as required.
Inspect for loose or
missing mounting hardware.
Tighten loose mounting
hardware. Replace missing
mounting hardware.
Battery
i n s u f f i c i e n t ly
charged or
damaged. Battery
cables damaged.
Class III leak.
Pump assembly
damaged or
c r a c k e d . M i s s i ng
mounting
hardware.
2-10
TM 10-4320-344-24