TM 10-4320-310-14
Table 2-2. Operator's Preventive Maintenance Checks and Services (Continued)
B -Before Operation
A -After Operation
M - Monthly
D - During Operation
W -Weekly
B
D
A
W
M
7
Fuel System (Continued)
Check fuel hoses (1) for leaks at banjo bolt (2) and
Fuel leaks or fire
double ring piece (3)
hazard resulting from
leakage.
INTERVAL
ITEM
NO.
ITEM TO BE INSPECTED
PROCEDURE
Equipment is
Not Ready/
Available
2-18