TM 10-4320-310-14Table 2-2. Operator's Preventive Maintenance Checks and Services (Continued)B -Before OperationA -After OperationM - MonthlyD - During OperationW -WeeklyBDAWM7Fuel System (Continued)•Check fuel hoses (1) for leaks at banjo bolt (2) andFuel leaks or firedouble ring piece (3)hazard resulting fromleakage.INTERVALITEMNO.ITEM TO BE INSPECTEDPROCEDUREEquipment isNot Ready/Available2-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business