TM 10-4320-310-142-2. PMCS PROCEDURES (Continued)Equipment is allowable with minor oil leakages (Class I or II). Ofcourse, you must consider the fluid capacity in the Item/system beingchecked/inspected. When in doubt, notify your supervisor.When operating with Class I or Class II oil leaks, continue to checkfluid levels as required In your PMCS.All fuel leaks and Class II oil leaks should be reported to yoursupervisor or unit maintenance.Table 2-2. Operator's Preventive Maintenance Checks and ServicesNOTEIf the equipment must be kept in continuous operation, check andservice only those items that can be checked and serviced withoutdisturbing operation. Make the complete checks and services whenthe equipment can be shut down.Perform weekly as well as before operation PMCS if:(1) You are the assigned operator and have not operatedthe item since the last weekly.(2) You are operating the item for the first time.Within designated interval, these checks are to beperformed in the order listed.B - Before OperationA - After OperationM - MonthlyD - During OperationW - WeeklyBDAWM1Frame Assembly and Warning PlatesCracks are detected,or engine is loose.•Check attaching hardware used to mount componentsof centrifugal pump unit. Attaching hardware shallbe tight and free of corrosion and damage. Componentsof pump attached directly to frame (1) are:Warning plate (2)Engine brackets (3)Identification plate (4)INTERVALITEMNO.ITEM TO BE INSPECTEDPROCEDUREEquipment isNot Ready/Available If2-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business