Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
B-4. Explanation Of Columns In Tool And Test Equipment Requirements, Section III.
MAINTENANCE ALLOCATION CHART (CONT) - TM-10-4320-310-14_175
TM-10-4320-310-14 Pump Unit Flammable Liquid Centrifugal Self-Priming 2-Inch 100 GPM Diesel Engine Driven NSN 4320-01-263-3604 Manual
Page Navigation
162
163
164
165
166
167
168
169
170
171
172
TM 10-4320-310-14
Section II MAINTENANCE ALLOCATION CHART
PUMP UNIT, FLAMMABLE LIQUID, CENTRIFUGAL,
SELF-PRIMING, 2-INCH, 100 GPM, DIESEL ENGINE DRIVEN
00
Pump Unit
01
Pump Assembly
Backhead
Inspect
0.1
1
Replace
1.0
Impeller Assembly
Inspect
0.5
1
Replace
1.0
Repair
1.0
B
Diffuser Assembly
Inspect
0.5
1
Replace
1.0
Repair
1.0
B
Shaft Seal
Inspect
1.0
1
Replace
1.0
Stub Shaft
Inspect
1.0
3
Replace
1.5
Housing Assembly
Inspect
1.0
2
Replace
1.0
Repair
3.0
B
02
Air Filter Assembly
Inspect
0.1
2
Service
0.5
Replace
0.5
Repair
0.5
Air
Filter Element
Service
0.1
Replace
0.1
F
03
Engine Assembly
Inspect
0.2
2
Service
0.2
Replace
2.0
MAINTENANCE LEVEL
(5)
TOOLS
AND
EQUIP.
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
(2)
COMPONENT
ASSEMBLY
(1)
GROUP
NUMBER
C
O
F
H
D
UNIT
DEPOT
GS
DS
B-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business