Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
APPENDIX B Section Il. MAINTENANCE ALLOCATION CHART, TANK AND PUMP UNIT - TM-5-4930-230-13_174
APPENDIX B Section Ill. TOOL AND TEST EQUIPMENT REQUIREMENTS MAINTENANCE ALLOCATION CHART.
TM-5-4930-230-13 Tank and Pump Unit Liquid Dispensing for Truck Mounting (Advanced Industries Model 1800) FSN 4930-070-1181 Manual
Page Navigation
125
126
127
128
129
130
131
132
133
134
135
TM5-4930-230-13
(1)
(2)
(3)
(4)
(5)
(6)
Group
Maintenance
Maintenance Category
Tools &
Number
Component/Assembly
Function
C
O
F
H
D
Equipment
Remarks
02
Tanks
0201
Lifting Shackles
Inspect
0.2
Replace
0.3
3
G
Tiedown Links
Inspect
0.2
Replace
0.3
3
G
Gasket Fill Plug
Inspect
0.1
Replace
0.2
3
A
Dispensing Valve
Inspect
0.2
Assembly
Replace
2.0
3
Repair
2.0
4
G
Cam Lever Assy.
Inspect
0.2
Replace
2.0
2,3
G
Tank
Inspect
0.2
Replace
1.0
3
Repair
4.0
1,4,6
E
Manhole Cover
Inspect
0.2
K
Replace
0.5
3
Repair
0.5
3
G
Gasket,
Inspect
0.2
Manhole
Replace
0.2
A
B-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business