INTERVALTM 5-4320-302-14Table 2-2. Operator/Crew Preventive Maintenance Checks and Services-ContinuedBBEFORE OPERATIONDDURING OPERATIONAAFTER OPERATIONWWEEKLYMMONTHLYBDAWM323-Way Selector Valve and Fuel Line Assembly.Class III fuelleaks or firehazard result-WARNINGing from leak-age present.Severe burns, illness, or death may result ifpersonnel fail to handle diesel fuel properly.Observe the following precautions:·Do not inhale vapor.·Do not refuel near open flame, sparks, orexcessive heat.·Be certain fuel lines and connections aresecure.·Do not overfill fuel tank.·Work in a well-ventilated area.Visually check for fuel leaks at long nipple, valve stem,cap plug (if present), flare nut, male connector, andfuel line assembly.ITEMNO.ITEM TO BE INSPECTEDPROCEDURE:EQUIPMENT IS NOTREADY/AVAILABLE IF:2-48
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business