INTERVAL
TM 5-4320-302-14
Table 2-2. Operator/Crew Preventive Maintenance Checks and Services-Continued
B BEFORE OPERATION
A AFTER OPERATION
M MONTHLY
D DURING OPERATION
W WEEKLY
B
D
A
W
M
Check lube oil line end and banjo bolt for leakage.
Check engine side beneath shield for evidence of oil
leakage.
Check shield attaching hardware for tightness.
Check condition of paint. Paint shall be in good con-
tion with no bare metal or corrosion. Bare or corroded
metal shall be refinished as soon as possible in accordance
with MIL-T-704.
ITEM
NO.
ITEM TO BE INSPECTED
PROCEDURE:
EQUIPMENT IS NOT
READY/AVAILABLE IF:
2-18