TM 5-4320-300-14Table 2-2. Insert Procedure Here! (Continued)B -Before OperationA -After OperationM - MonthlyD -During OperationW -WeeklyINTERVALITEM TO BE INSPECTEDITEMIS NOT READY/NO. B D A W MPROCEDUREAVAILABLE IFInspect all main wiring harnes s connections and leads for secureBare or broken wires.attachment. Check for frayed insulation, broken wires, and otherdamage.Replace engine side panels.2-44
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business