TM 5-4320-200-13 & PSource codes are entered in the first and second positions of theUniform SMR Code format as follows:CodeDefinitionPAPBPCPDPEPFPGKDKFKBMOMFMHMDAOAFAHADXAXBXDItem procured and stocked for anticipated or known usage.Item procured and stocked for insurance purposes becauseessentiality dictates that a minimum quantity be available inthe supply system.Item procured and stocked and which otherwise would be coded PAexcept that it is deteriorative in nature.Support item, excluding support equipment, procured for initialissue or outfitting and stocked only for subsequent or addition-al initial issues or outfittings.Not subject to automaticreplenishment.Support equipment procured and stocked for initial issue or out-fitting to specified maintenance repair activities.Support equipment which will not be stocked but which will becentrally procured on demand.Item procured and stocked to provide for sustained support forlife of the equipment.It is applied to an item peculiar to theequipment which, because of probable discontinuance or shutdownof production facilities, would prove uneconomical to reproduceat a later date.An item of depot overhaul/repair kit and not purchased separately.Depot kit defined as a kit that provides items required at thetime of overhaul or repair.An item of a maintenance kit and not purchased separately.Maintenance kit defined as a kit that provides an item that canbe replaced at organizational or intermediate levels of mainte-nance.Item included in both a depot overhaul/repair kit and a mainte-nance kit.Item to be manufactured or fabricated at organizational level.Item to be manufactured or fabricated at the direct supportmaintenance level.Item to be manufactured or fabricated at general maintenancesupport level.Item to be manufactured or fabricated at depot maintenance level.Item to be assembled at organizational level.Item to be assembled at direct support maintenance level.Item to be assembled at general support maintenance level.Item to be assembled at depot maintenance level.Item is not procured or stocked because the requirements for theitem will result in replacement of the next higher assembly.Item not procured or stocked.If not available through salvage,requisition.A support item that is not stocked.When required,item will beprocure through normal supply channels.D-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business