TM 10-4630-207-13&P
0005 00
PREPARATION FOR MOVEMENT
To prepare the WWET/T for re-location or return shipment to CONUS the wastewater tank must be
Perform Before and After Operation PMCS as described in WP 0011 00.
Disconnect battery cables.
Wrap controls and pressure gage with barrier paper and secure with tape
WARNING
Do not use the tiedown rings located on the engine/vacuum pump skid to lift
the WWET/T. Serious injuries to personnel and damage to equipment may
result.
Use the tiedowns on the WWET/T frame to lift the WWET/T, or to secure it to a flatbed truck or rail car.
These tiedowns are located at the front (figure 55, item 1) and rear (figure 55, item 2) of the trailer
frame.
1
2
Figure 55. Lifting and Tiedown Points
END OF WORK PACKAGE
0005 00-33/(34 Blank)