Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
MAINTENANCE ALLOCATION CHART (Cont) - TM-10-4320-309-14_196
Section III. TOOL AND TEST EQUIPMENT REQUIREMENTS - TM-10-4320-309-14_198
TM-10-4320-309-14 Pump Unit Centrifugal Self-Priming 125 GPM Class 3 Diesel-Driven Army (NSN 4320-01-247-7127) Marine Corps (NSN 4320-01-313-9442) Manual
Page Navigation
184
185
186
187
188
189
190
191
192
193
194
TM 10-4320-309-14
TM 4320-14/1
(1)
Group
Number
1205
13
1301
1302
1303
B-8
Section II. MAINTENANCE ALLOCATION CHART (Cont)
(2)
Component/
Assembly
Crankcase
Frame Assembly
Frame Assembly
Base Plate
Shock Mounts
(3)
Maintenance
Function
Replace
Inspect
Repair
Replace
Replace
Replace
(4)
Maintenance
Level*
O
0.1
F
2.5
1.0
1.0
H
5.0
1.0
1.5
(5)
Tools &
Equip-
ment
2,6,7,
21,22
2,16,17
- - --
2,6,8
2,6,8,
17
2,6,8,17
(6)
REMARKS
B
B
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business