TM 5-4320-300-14
Table 2-2. Operator/Crew Preventive Maintenance Checks and Services - Continued
B -
Before Operation
A -
After Operation
M - Monthly
D -
During Operation
W -
Weekly
INTERVAL
ITEM TO BE INSPECTED
ITEM
IS NOT READY/
NO. B D A W M
PROCEDURE
AVAILABLE IF
Clean fuel tank strainer, if dirty. Check level gage
operation. Refill tank at the end of each day's
operation or after 8 hours of continuous service.
9
Fuel Supply and Return Lines, Hoses, and Fittings.
There is any
Inspect for leaks. Leaks can best be detected by
leakage.
accumulation of fuel under gas tank, fuel lines, and
hoses. Fuel lines and hoses are located on top of
fuel tank. Check for loose fuel line and hose fittings
and inspect for wear and cracks. Tighten fittings if
necessary.
2-18