TM 5-3820-276-10-1
0063
COLD WEATHER STARTING PROCEDURES - WATER WELL DRILLING RIG (WWDR) AND WATER WELL
SUPPORT VEHICLE (WWSV) - Continued
2.
3.
Push bottom of WATER HEATER switch (Figure 2, Item 1) to Off position when no longer needed.
END OF TASK
END OF WORK PACKAGE
0063-5/blank
02/13/2013root(opunuwp)wpno(O00009)