TM 10-4320-307-24
2-61 PREPARATION FOR_SHIPMENT.
a.
Prepare pumping assembly for intermediate storage (more than 30 days) in accordance with paragraph 2-60.
b.
Cushion contents of toolbox with sufficient dunnage to prevent damage when pumping assembly is shipped.
c.
Remove flexible coupling as follows:
NOTE
To avoid misalignments of the shafts during shipment, it is necessary to remove the power
pack section of the flexible coupling.
(1)
Remove four screws and washers (1) securing
protective cover (2) to engine enclosure and
remove cover.
(2)
Remove bolts (3) from standard hub (4) and hub (5)
CAUTION
Do not pry apart hub grooves as this may damage
the machined surfaces.
(3)
Remove flexible coupling (6) with rubber
hammer.
(4)
Install bolts (3) into flexible coupling (6) and
fasten to skid with U-bolt (7).
(5)
Protect flanges of hubs (4 and 5) and coupling
(6) during shipment by lubricating and covering
with protective cloth and tape.
2-236