TM 10-4320-307-24
2-30
FIELD INSTRUMENT LAYOUT TEST/REPAIR/REPLACE (CONT).
INSTALLATION:
1.
Install wires in box (1) and remove tags.
2.
Position cover and gasket (2) on box (1) and secure using four screws (3).
3.
Install pump suction pressure switch wiring in flexible conduit and solder wires to connector. Remove tags.
4.
Position box (1) on mounting (4) and secure using four lockwashers (5), screws, and nuts (6).
5.
Connect coupling (7) and tighten.
6.
Install connector J3 (8) on junction box JB1 (9).
2-110